Central office: Ukraine, Zaporizhia, 69007. vul. Vereshahyna 17. Kiev office: Ukraine, Kiev, 03039. vul. Holoseevska 13

Leading innovative engineering company

a major regional distributor of European equipment

Leading innovative engineering company

a major regional distributor of European equipment

About our company

TSKS – is a leading innovative engineering company , a major regional distributor

Our areas of activities:

– production of the low voltage complete devices, more than 500 items per year;
– project development and execution (tech process automated systems, electrical distribution systems);
– installation and commissioning works;
– supply of the top quality components from Europe.

Partnership with TSKS will help your company to streamline your production, to reduce all operating costs, to strengthen the equipment’s life cycle and to reduce the energy consumption.

We are working closely with the following companies: Zaporizhstal, Zaporozhtransformator, Azovstal, Ilyich Iron and Steel Works.

All TSKS products are in line with the world level standards. We have responsibility for each and every product that we produce and for each and every service that we provide. Our production is aligned with the ISO 9001:2015.

Benefits of working with TSKS:

– individual approach to each project;
– competitive and favourable offers;
– full support during project execution;
– flexible payment system with possible special terms;
– full warranty period including upon its expiration;
– faster supply straight from our vendors or our own warehouses from Kiev and Zaporizhia regions.

CERTIFICATES AND LICENSE

10.03.2018

Accreditation from Imperial Tobacco

We've officially obtained accreditation from Imperial Tobacco this month. It has allowed us to become official suppliers of this world-famous company. It became possible by means of our experts' hard work on the program about the calculation of overall equipment effectiveness (OEE). By introduction of special systems of the overall equipment eff

18.02.2019

More than 150 power cabinets were designed and completed

More than 150 power cabinets were designed and completed by our company on request of our partners Metinvest Engineering. For less than three months from the moment of receiving the order confirmation, our experts managed to make these power cabinets designed for the needs of the blast furnace No. 3 capital construction for Azovstal, Ukrainian stee

1.07.2019

(Руc) Акция от RITTAL!

Sorry, this entry is only available in Russian and Ukrainian.